
The idea was to be the first vessel with a LNG-fuelled 2-stroke engine to be operated in Europe. To offer manufacturers, Classification Society and owners a first experience of a high pressure LNG fuel system for a tanker, and is an essential part of the LNG infrastructure establishment of the Pilot LNG. Today the ship and sister ships are being built to a slightly different design.